Project Archive
Earlier project information and notices, kept here for reference.
Facts vs. Fiction
The Facts vs. Fiction page, as published before the September 17, 2026 City Council vote.
Past Notices
Every notice posted to the Alerts page before September 29, 2026.
- September 1, 2026City of Tampa Response to the SoHo Business Alliance’s Alternate Route
- August 4, 2026Join us for an OPEN HOUSE!
- March 31, 2026Notice to Residents – March 2026
- January 27, 2026Notice to Residents/Businesses – January 26, 2026
- December 5, 2025Notice to Residents/Businesses – December 5, 2025
- August 1, 2025Notice to Residents & Businesses – Survey Work / S. Howard Avenue – August 15, 2025
- July 31, 2025Notice to Residents & Businesses – July 31, 2025
- July 2, 2025Notice to Residents/Businesses – July 2025
- February 1, 2025Notice to Residents/Businesses – February 2025
Design and Study Documents
The reports, studies, design boards and meeting materials from before construction, kept as they were published, for reference.
44 documents.
Project Documents
- Final Preliminary Engineering Report (Signed and Sealed)PDF · 375 MB · 3737 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Final Findings from Analysis of Alternative ProjectsPDF · 1.0 MB · 7 pages
- Benefit-Cost AnalysisPDF · 597 KB · 2 pages
- Draft Preliminary Engineering Report (Complete document without appendices)PDF · 65 MB · 177 pages
Draft Preliminary Engineering Report Appendices (18)
- Appendix A – SHFR Design Criteria PackagePDF · 19 MB · 148 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Appendix B – Field Investigation PhotosPDF · 4.4 MB · 18 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Appendix C – Tree SurveyPDF · 2.4 MB · 14 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Appendix D – Finished Floor ElevationsPDF · 467 KB · 2 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Appendix E – Traffic Data CollectionPDF · 290 KB · 22 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Appendix F – Existing Drainage BasinsPDF · 656 KB · 2 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Appendix G – Model Subbasin MapsPDF · 1.2 MB · 5 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Appendix H – Model Hydraulic Connectivity MapsPDF · 2.8 MB · 5 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Appendix I – Roadway FPLOS Comparison of Existing vs Proposed MapPDF · 601 KB · 2 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Appendix J – RECM Predicted Structure Flooding MapsPDF · 1.1 MB · 2 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Appendix K – Flood Extents Comparison Existing vs ProposedPDF · 8.8 MB · 19 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Appendix L – Preliminary Construction Cost EstimatePDF · 216 KB · 13 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Appendix M – Memo – Findings from Analysis of Alternative ProjectsPDF · 1.1 MB · 8 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Appendix N – Geotechnical Exploration DocumentationPDF · 1.7 MB · 10 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Appendix O – Model Input and ResultsPDF · 5.4 MB · 2591 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Appendix P – Relevant Permitting DocumentationPDF · 38 MB · 185 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Appendix Q – Relevant As-built PlansPDF · 223 MB · 501 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Appendix R – Historical Stormwater Inventory DataPDF · 850 KB · 7 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Draft Preliminary Engineering Report Executive SummaryPDF · 2.5 MB · 15 pages
- Frequently Asked QuestionsPDF · 462 KB · 2 pages
- Project Map - Alternative SegmentsPDF · 3.3 MB · 1 pageThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Findings from Analysis of Alternative ProjectsPDF · 1.9 MB · 7 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Route Study & Streetscape Concepts Presentation – June 5, 2025PDF · 6.1 MB · 19 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- South Howard Streetscape Concepts Display Boards - June 5, 2025PDF · 6.8 MB · 6 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- JMT – Preliminary Engineering Report (Feasibility Study) – April 2022PDF · 53 MB · 104 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Public Meeting Summary - November 18, 2024PDF · 1.8 MB · 10 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
August 11th – 60% Design Open House
- Board - Project PhasingPDF · 3.3 MB · 1 pageThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Board - Project Benefits & HighlightsPDF · 355 KB · 1 page
- Board - Location MapPDF · 5.6 MB · 1 page
- 60% Design Project FundingPPTX · 1.1 MB
- 60% Design Roll Plot (Swann Ave)PDF · 2.2 MB · 1 pageThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- 60% Design Roll Plot (Howard Ave) Streetscape 1PDF · 4.0 MB · 2 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- 60% Design Roll Plot (Howard Ave) Streetscape 2PDF · 4.4 MB · 2 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
March 5th – 30% Design Open House
- Board - Construction Impact ExamplesPDF · 19 MB · 1 pageThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Board - Preliminary PhasingPDF · 13 MB · 1 pageThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Board - Truck RoutesPDF · 2.6 MB · 1 pageThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Board - Cross SectionsPDF · 36 MB · 1 pageThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Board - Project BenefitsPDF · 4.0 MB · 1 pageThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- Board - Streetscape ConceptPDF · 38 MB · 4 pagesThis document is part of the project’s record, kept as it was published for reference, and may not be fully accessible; for an accessible version, contact info@SHStormwater.com or (813) 467-7887.
- 30% Design Roll PlotPDF · 1.4 MB · 3 pages
August 2026 draft
Project Map – Stormwater Improvements
This map was on the Project Information page. The construction phase map replaces it.

November 2025
Project Schedule
This schedule was on the Project Information page. It showed project design running from January 2025 to March 2026; the note beneath it read: “Activities and schedules are subject to weather and other unforeseen circumstances. Project construction is anticipated to begin in late summer 2026.”

As of November 2025
Current/Upcoming Activities
All survey work for the project’s design phase is complete. Additional surveying may be performed if engineers identify information needed to finalize the design.
Right-of-way line verification is currently underway and expected to be completed by mid-November 2025.
Geotechnical boring (drilling of small test holes in the ground to explore sub-surface conditions) began on W. Swann Avenue on Saturday, November 1, 2025, and will continue into the Parkland Estates neighborhood. This work is necessary because future stormwater pipes will extend into Parkland Estates to move water to the planned box culvert on W. Swann Avenue.
The City has received questions about survey activities along W. Bristol Avenue, west of S. Howard Avenue. A Sunshine 811 utility location request mistakenly included a larger area of W. Bristol Avenue than intended. Work along W. Bristol Avenue is only expected between S. Howard Avenue and the Selmon Expressway to support drainage for the Selmon Expansion project. The recommended box-culvert route under design is the W. Swann Avenue route.
The information gathered helps ensure plans are accurate and construction is designed safely and effectively.
Box culvert construction will require City Council approval once the project reaches the 60% design milestone. Those drawings, along with the proposed Guaranteed Maximum Price (GMP) contract, are expected to be presented to the City Council in summer 2026.
