Project Overview

Approved by Tampa City Council on September 17, 2026, the South Howard Flood Relief Project is a generational drainage project that addresses chronic flooding while transforming one of Tampa’s most recognizable streets, South Howard Avenue, into a more walkable, more attractive destination for locals, businesses and visitors.

And this is all possible because of the project’s main benefit: draining millions of gallons of stormwater from Parkland Estates, Palma Ceia Pines and surrounding neighborhoods. The project uses approximately 6,500 feet of large underground box culvert to create an “underground river” that will move stormwater to Hillsborough Bay. It will also serve as a “spine” that other South Tampa neighborhoods can connect to, providing even more flood protection.

To support Howard Avenue businesses during construction, the work will be phased, with crews working on smaller segments at a time and restoring each area as they move up Howard and into Palma Ceia Pines. A robust small-business support plan and “sohOPEN” marketing campaign will also encourage people to continue supporting local businesses throughout construction. Sidewalk access will remain open.

Background

As part of the City of Tampa’s Stormwater Improvement Program, the South Howard Flood Relief Design-Build project is a much-needed capital improvements project aimed at alleviating flooding within the City’s stormwater improvement area.

The project consists of design and construction of a major stormwater conveyance system that includes more than 8,000 linear feet of box culvert, pipes, and drainage inlets.

Rendering of the redesigned South Howard Avenue: wide sidewalks with brick accents, street trees and historic-style lamp posts beside shops and outdoor dining.
Renderings from the 60% design, presented at the August 11, 2026 open house.

The New Streetscape

Streetscape improvements along S. Howard Avenue, to enhance safety, improve walkability, and provide wider sidewalks, better lighting, and upgraded landscaping for a more inviting shopping and dining experience.

See the new streetscape

Getting Around During Construction

  • Maintain Pedestrian Access

    Safe walking routes and clear signage will help customers reach businesses in active construction areas.

  • Clear Signs and Detours

    Signs will help drivers and customers navigate construction and find businesses along the route.

  • Traffic

    Temporary street/lane closures, traffic shifts, and detours will be required to accommodate construction activities. Impacted areas will be clearly marked using signage, as well as flaggers, as needed, to direct motorists, pedestrians, and bicyclists through and around construction zones.

  • Truck Routes

    Construction trucks will use the proposed truck routes on the 60% design board. View the truck routes board (PDF)

Truck Routes board: the proposed truck route runs along Howard Avenue, Azeele Street and Dale Mabry Highway, and along Swann Avenue and Henderson Boulevard.
Board - Truck Routes, 60% design open house (PDF).

How businesses will be supported during construction

Key Documents

All project documents

The project archive includes the design and study documents, and the original project map and schedule. Project archive